Automation Direct P2k P3k Productivity Remainder

GTUnit

Member
Join Date
Oct 2009
Location
Orange, CA
Posts
401
Im having a lot of trouble programming a Minutes and Seconds count down timer display in Productivity Software.

Is there a math instruction that can separate the remainder from a division result like MODULO in other platforms? i had no problem doing this in RSLogix.
 

Similar Topics

Hello, I have an automation direct d2 262 plc and C-more HMI EA9T6CL-R. I need to prepare a program, scheduled to be performed on a future date. I...
Replies
1
Views
117
Hello all- I have a unique challenge using a customers Direct logic 06 PLC. This customer has a DC motor operating at 10 RPM which is turning a...
Replies
1
Views
136
Hi, I have been trying to run drive via Sysmac studio. I can ping the drive. I can see the logic bits going on/off as per command. But, drive is...
Replies
21
Views
561
Anyone tried Automation Directs new CM5 HMI. We've been the EA9's for a few years now with minimal complaints. A few failures here and there but...
Replies
17
Views
1,579
I'm using an Automation Direct GS20 VFD for the first time and I have a question for the Automation Direct gurus regarding the recommendation of a...
Replies
2
Views
1,094
Back
Top Bottom