Hi everybody!
Im planing to control 350(I/O's)points total with S7-416 PLC.. I will use 5 ET200M (on Profibus) stations and each has sum of 70 controlled I/O's.
There will be 5 operator panels too(OP17).
So, Im wondering - Will this PLC handel it?
Anybody has done it before? Please share your experience..
Thanks in advance!
Im planing to control 350(I/O's)points total with S7-416 PLC.. I will use 5 ET200M (on Profibus) stations and each has sum of 70 controlled I/O's.
There will be 5 operator panels too(OP17).
So, Im wondering - Will this PLC handel it?
Anybody has done it before? Please share your experience..
Thanks in advance!