Move data in ProWorx

sandymax

Member
Join Date
Nov 2004
Location
India
Posts
112
Hello
i am new to proworx Nxt , iam nor geeting idea how to move a fix data to register

condtion 1 Mov 10 to 40010
condition 2 Mov 20 to 40010

Thanks
Sandy
 

Similar Topics

Afternoon, I have a DB in TIA Portal V16 that is optimised. I cannot change this. There is an array inside that block which consists of 3000...
Replies
9
Views
1,141
hi i have a baumer vision unit picking up a QR code this is connected to a siemens 1200 plc. i have a IB18 In the device that is the start of...
Replies
16
Views
9,343
Hi, can anybody tell that how can we move floating point data from one Regiter to another register in Fatek PLC.?
Replies
0
Views
1,547
Hi, Ok bear with me, I have an Array of Real in a DB ranging from 0 to 10. In ladder I want when count pulse = 100 move count into Array 0...
Replies
1
Views
2,079
I have been bashing my head up against this one for a while, so take some pity on me if I wind up coming off as very confused. I have 4 tags...
Replies
8
Views
2,284
Back
Top Bottom