ante Member A Join Date Jun 2005 Posts 1 Jun 9, 2005 #1 does anyone has some expreience with this. also making a multiproject in 6.1 out of a 5.2 single project? also with 3 old AS400s that don't support firmware upgrade? what is the proper way I can do this thanks
does anyone has some expreience with this. also making a multiproject in 6.1 out of a 5.2 single project? also with 3 old AS400s that don't support firmware upgrade? what is the proper way I can do this thanks