I need the ability to record the days part count from a conveyor line (controlled by an SLC500) and display the data on a PV1200 HMI. I intend to show the last 28 days of data on the HMI. For each new day that occurs then the oldest day drops off the list.
I assume that I will need to use the real time clock within the PLC to be able to achieve this along with some kind of "shift register" capable of storing/displaying up to 28 days of data?
Any ideas anyone? Thanks in advance for your help.
I assume that I will need to use the real time clock within the PLC to be able to achieve this along with some kind of "shift register" capable of storing/displaying up to 28 days of data?
Any ideas anyone? Thanks in advance for your help.