I have used different PLC's in the past but I am working on a project and editing a small project using an AB PLC5. This is an easy question but I am unfamiliar with PLC5. Could someone explain the Key switch modes: Program, Remote Run, and Run. When to use what mode and when to not and the rules on switching when an opertion is ongoing. I currently have a PLC5 running an operation and the Key switch is in Run and I want to do editing on several rungs but cannot due to it because it is in Run. Can I switch the Key from Run to Remote Run without disturbing the operation? I read not do switch to Program because it will disable the operation the PLC5 is controlling. Help me in this uncertain area on the do's and don'ts