prasadtoke
Member
Dear All,
I have the following configuration;
1.S7-300 313c-2DP as a master.
2.M-system distribued I/os (similar to ET-200m)
I want to configure the above system in master slave the 300 cpu being the master.
After configuring the system in HW config of simatic manager by importing the GSD file of M-system i'm getting Bus fault and System fault on S7 CPu.
Also in the diagnostic buffer of S7 CPU i'm getting the following error
"DISTRIBUTED I/Os END OF SYNCHRONISATION WITH A DP MASTER"
Kindly let me know if possible in detail with a simatic manager setup what is going wrong in the setup
Thanks
Prasad
I have the following configuration;
1.S7-300 313c-2DP as a master.
2.M-system distribued I/os (similar to ET-200m)
I want to configure the above system in master slave the 300 cpu being the master.
After configuring the system in HW config of simatic manager by importing the GSD file of M-system i'm getting Bus fault and System fault on S7 CPu.
Also in the diagnostic buffer of S7 CPU i'm getting the following error
"DISTRIBUTED I/Os END OF SYNCHRONISATION WITH A DP MASTER"
Kindly let me know if possible in detail with a simatic manager setup what is going wrong in the setup
Thanks
Prasad