Hi,
what is the proper blinking speed red led of the plc after release "copy switch" during manual loading process(loading program eprom to plc). My red led on the Plc blinking with 0.5s interval after relase the "copy" switch. Is 0.5s blinking normal or should be faster?
Regards.
Joker
what is the proper blinking speed red led of the plc after release "copy switch" during manual loading process(loading program eprom to plc). My red led on the Plc blinking with 0.5s interval after relase the "copy" switch. Is 0.5s blinking normal or should be faster?
Regards.
Joker