S7 Graph, too many conditions for transition

userxyz

Member
Join Date
May 2002
Location
any
Posts
2,768
Hi,

I have a lot of conditions in the interlock.

What I need is adding eerything of the interlock in my transition, see below, how can I do this ?

Adding all the conditions is not possible, there are to many,

can't I use the interlock itself ?

fdsfds.jpg
 
hmm

That's something that I could find myself, and I don't like it at all

Dirt said:
Make logic for transitions outside S7 graph, store in a memorybit and use the memorybit as transition?
 
Set an N action and set the Operator checkbox "Depends on interlock" then you get a memorybit that is high only when interlockconditions are fullfilled or stop the sequencer on Error.
 
Last edited:
ok

ok, I'll try it



Bratt said:
Set an N action and set the Operator checkbox "Depends on interlock" then you get a memorybit that is high only when interlockconditions are fullfilled or stop the sequencer on Error.
 
Combo said:
That's something that I could find myself, and I don't like it at all

That response is just plain rude...'Dirt' was trying to be helpful.

If you had already thought of the method he suggested and ruled it out, you should have stated it in your original post.
 
okay

I know, and thank you to 'Dirt'. Sorry if I was rude, it wasn't ment in that way, I'm never rude in my posts normally, so big sorry to 'Dirt'.

I just didn't like to make something outside the sequencer, I prefer Bratt his solution, but offcourse 'dirt' his would work



krk said:
That response is just plain rude...'Dirt' was trying to be helpful.

If you had already thought of the method he suggested and ruled it out, you should have stated it in your original post.
 
:)

Don't push it, I made my point.

Writing outside the sequencer was something that I've tought also, make something like: All in, All out and using it as an IN parameter, but, I just prefer to stay inside the sequencer.

thanks for the help to ya all !!!

CharlesM said:
I think Combo was just mad at himself for not thinking of it first.
 

Similar Topics

Hello Folks! I have an issue and its very often but in this case i applied all the tricks and tips that i always do in similiar issues but in this...
Replies
2
Views
776
Hi all - Considering using S7 GRAPH for some sequencing. I have a few questions which I am having difficulty finding clear answers to in the...
Replies
0
Views
577
Can someone explain the order of processing the actions of a step...is it top - bottom see attachment for reference. Does it process the blkmov...
Replies
1
Views
2,075
the plant I am supporting uses a siemens graph function to do some of the step procedures. in several steps it waits for the step to execute for...
Replies
1
Views
767
I'm still getting used to working with Siemens Step 7 Classic, and WinCC in the Simatic Manager package. I need a trend line on the MP377 HMI, and...
Replies
2
Views
1,841
Back
Top Bottom