Hi, Quick question. In a gx developer program SFC block i want to use the time a step is active as a transition to the next step. Is there like a standard Step6.T (siemens); X4.T (Telemecanique),... in gx developer i can use. How would be the easiest way to do this?
Thanks a lot
Thanks a lot