Dear Friends;
I have prepared a logic in SLC 5/03 (through RS Logix English) which is installed in our corrugator machine that whenever my machine stops a RTD timer starts and counts the down time hours. AT the end of month, I reset that timer and saves the previous value.
My problem is that when operators switch off the machine due to no job, the PLC also switches off and you know that RTD doen't work with SLC power off state. Can any body direct me to any SLC insturction which would fullfil my requerment or any trick?
Thanks in advance
I have prepared a logic in SLC 5/03 (through RS Logix English) which is installed in our corrugator machine that whenever my machine stops a RTD timer starts and counts the down time hours. AT the end of month, I reset that timer and saves the previous value.
My problem is that when operators switch off the machine due to no job, the PLC also switches off and you know that RTD doen't work with SLC power off state. Can any body direct me to any SLC insturction which would fullfil my requerment or any trick?
Thanks in advance