Thanks JRW,I retrieved this project into Step7,I have 2 VSD with each one 2 slots, the first is PRO type 2 and add 60...67
the second slot 68..79, then another drive with PRO type 2 and add 40...47,the second slot 48..59,so so, i will copy ABB program to the exist program i have, , and how can I use the PZD to map your current and speed data out of the drive.Thanks