Programming an Adoit Calender

mot

Member
Join Date
Sep 2009
Location
Sandton
Posts
22
Hey All, Has any of you written a Calender in Adroit? I need to display a calender in adroit that allows the operator to select days in the callender. Now, when the system date reaches the selected date, a bit must be sent to the plc. I can assign variables to each day in the calender, but thats gonna take ages and use up alot of tags/agents. Any ideas?
Thanx :confused:
 
use a selector type function where the operator enters the date. you can then use 3 comparators for day, month, and year and compare either in adroit to pc date time or to plc date time. Ill have a look in adroit maybe its got some date agent built in
 

Similar Topics

Dear all, I have fx2n plc on my hand but I don't have the programming cable sc-09 and it would not be easy for me to get one. I need the cable...
Replies
3
Views
92
Hi all, i am the new controls guy at the plant and i have inherited a pc from the previous controls guy with Siemens tia portal version 16 and 17...
Replies
20
Views
870
I need to pull the program off of an old 90-30 so I can convert it to Allen Bradley. This is my first time messing with GE and I don't have the...
Replies
2
Views
84
New to vfds. I put in parameters. IP, but I get ethernet flashing and link solid. What did I do wrong?
Replies
9
Views
467
I'm been deciphering a program for a press here. I've gotten most of it deciphered using the manual to understand the instructions (first mitsu...
Replies
11
Views
280
Back
Top Bottom