If you don't plan on adding parameters, (STAT, IN, etc) then no problem.
If you do want to add parameters, modify the parameters but don't modify the code yet, then check block consistancy and compile all. This will re-align all IDB's.
Then make the code changes.
The PLC will need a download afterwards.