Mariot1 Member M Join Date Dec 2010 Location Montreal Posts 3 Dec 15, 2010 #1 Gentlemen's I have two L61 processors in the same rack... I am Able to produced Tag from A (CPU Slot 0) to B (CPU Slot 12) put not the other way around. I need to be able to also do from B to A. Any help would be greatly appreciated.
Gentlemen's I have two L61 processors in the same rack... I am Able to produced Tag from A (CPU Slot 0) to B (CPU Slot 12) put not the other way around. I need to be able to also do from B to A. Any help would be greatly appreciated.
crimson75 Member C Join Date Dec 2010 Location CT Posts 8 Dec 15, 2010 #2 Rockwell Publication 1756-PM011B-EN-P
Mariot1 Member OP M Join Date Dec 2010 Location Montreal Posts 3 Dec 15, 2010 #3 Produced/Consumed Crimson75, I read the book but still don't see any exemple or troubleshooting explaning going from B to A...
Produced/Consumed Crimson75, I read the book but still don't see any exemple or troubleshooting explaning going from B to A...
Mariot1 Member OP M Join Date Dec 2010 Location Montreal Posts 3 Dec 15, 2010 #4 Bad config Found it, One tag was not configured properly in the consumed side of the operation from B to A Thanks for your help
Bad config Found it, One tag was not configured properly in the consumed side of the operation from B to A Thanks for your help