I'm looking to get a powerflex 70 vfd and I need with an internal brake resistor and a RIO comm module. The distributor tells me that with the resistor and comm module options, the delivery is 8 - 10 weeks. I can get the VFD in 3 - 4 weeks if I buy it without the options and it looks like the same time frame I can buy the comm module and brake resistor as accessories.
I'm wondering if I buy everything separately if I can assemble the parts into the VFD with no issues and save my self some delivery time. or is it not that straight forward to add the accessories to the drive?
I'm wondering if I buy everything separately if I can assemble the parts into the VFD with no issues and save my self some delivery time. or is it not that straight forward to add the accessories to the drive?