I've been asked to control the output of an Ozone Generator based upon the Ozone Residual value measured after the ozone does it's work. Problem is that the time between generator setpoint change and resultant change in residual is in the twenty-minute ball-park. Compounding the problem is that the measured residual is not what one would call a "stable" signal; it tends to jump around a bit.

Any suggestions will be appreciated!
 
Are you trying to minimize residual? 20-30 minutes is not uncommon for ozone to make its way from the generator then out to the the destruct. I would put some kind of averaging on the residual signal and use that as a trim on the setpoint. But you would still be left with a lag of about 1/2 hour.
 
You've basically confirmed my suspicion that "trimming" is about all that can be expected. Some other method will be necessary to get a starting point.

And, yes, any ozone that is not absorbed in the process is wasted. So the idea is to minimize the waste.

Thanks for your response.
 

Similar Topics

Hello. This is for motion experts, and EtherNet/IP and DeviceNet system integrators. I am more into communication and I sometimes need to advice...
Replies
0
Views
914
Hello everyone, For a project with 30 inputs, 30 outputs, including 2 servo motors and 4 AC induction motors on VFDs, a interlocking fence...
Replies
17
Views
4,317
Our company uses Dell computers. I am trying to get a new laptop for our maintanance dept. They are going to have a wide range of software...
Replies
14
Views
5,324
Hello, I have a motor that we are sending a RPM Speed Output from 0-100% to the VFD. However, the Motor HP needs to be limited to 6000 HP and the...
Replies
3
Views
90
Hello, I have a quick question. I have been using scripts to change the color of buttons. The reason, I am usually using multiple hmiruntime.tags...
Replies
1
Views
100
Back
Top Bottom