suchitradevi79
Member
Hi
Currently i am doing a programming in AB plc
In this, the operator need to enter the "filling time" which will be around 12-16 hours on the HMI.
I need to open a solenoid valve for the time entered from the HMI.Please help me how to achieve this. If u have a sample program, please help me.
Thanks
Currently i am doing a programming in AB plc
In this, the operator need to enter the "filling time" which will be around 12-16 hours on the HMI.
I need to open a solenoid valve for the time entered from the HMI.Please help me how to achieve this. If u have a sample program, please help me.
Thanks