STEP 7 automatic program status change on blocks

Nepiter

Member
Join Date
Apr 2010
Location
At job
Posts
79
What could be wrong..?

I have tried to set on and off this ticker "automatic program status change on blocks" (at customize menu), to have back that automatic online monitoring, when I switch to another block.. But no, I need to switch everytime those goggles, to get online.

Previously (yesterday) I have been able to monitor at least 2 blocks same time, windows arranged to vertically. But not anymore..

This makes My life with programming a bit difficult now.

Have anyone ideas what to do, to have multiple monitored blocks open same time..? Or to have back that automatick online status change, when switching between blocks..?
 
Where the tickbox is to set 'Automatic Program Status Change on Blocks' is the tick box below that for 'Terminate ONLINE Connection After Program Status' also checked?
 

Similar Topics

Hello Everyone, I have been given a task at work to construct an automatic actuator to perform accelerated life test on some of our products. I...
Replies
3
Views
1,753
Hi guys, i was trying to make a program in simatic step 7 with which i could with the useing of a switch choose between automatic, manual and step...
Replies
0
Views
4,643
I am having a step7 v5.4 program where the blocks are encrypted and locked. And the manufacturer is stopped the support. Is there any ways to...
Replies
2
Views
168
Good Morning, Hoping someone with some Siemens experience can give me a hand with this one. Customer has a S7-200 cpu, which has a 6GK7...
Replies
0
Views
239
HI! HOW COULD I OBTAIN THE NAMES OF THE STEPS OF A ROUTINE IN SFC LANGUAGE IN STUDIO5000? Or is there a system variable that gives me those...
Replies
0
Views
338
Back
Top Bottom