5/05 execution time

Doug-P

Member
Join Date
Jun 2003
Location
Pa
Posts
1,248
I'm trying to find the instruction execution times for SLC 5/05. The online version of the instruction set reference lists this info in the index but what's actually on the page given is memory usage.

I've got a hard copy of the 5/03, 5/04 instruction set reference which does give execution times. Maybe the 5/05 is the same as the 5/04?

Any suggestions where to look next?

Thanks
 
kolyur,

Although the email notification shows your most recent post the site does not - curious. Anyhow, the execution time/memory usage time confusion thing I'll just chalk up to human fallibility. As a side note, it turns out that the execution times for the 5/04 and 5/05 are, with trivial exceptions for carrying out decimal places, identical.

Have a good day!
 

Similar Topics

Good morning. I'm doing a rehab and I need to recycle some part of the old code that won't change and that I need. This is a calculation that...
Replies
22
Views
1,170
Hi, We have a machine with 9 servo motors and Kinetix 5100 drives. The controller is L33ER and there is no motion control in the project. The...
Replies
8
Views
1,162
Another daft question coming up... In the picture, suppose "Data_block_1.Calculate Diff" is TRUE. What's the order of execution of the...
Replies
3
Views
670
Hello gentlemen, If I have more than one Program POU assigned to the same PlcTask, how do I changed the priority of which program executes...
Replies
9
Views
3,375
Back
Top Bottom