I have a request from a customer to totalize a dry powder addition, with a display of the total in kg added in the last 12 cycles.
So I would need to use the amount added during one cycle of the machine and have it displayed on my hmi in the last 12 cycles.
The program goes through a step sequence so when it finishes the dry powder fill sequence and/or the last sequence of the cycle I can grab the dry powder added that cycle....Im a little lost how to have it move it along the chain of the last 12 cycles...
Can anyone point me in the right direction?
Thank you
I have a request from a customer to totalize a dry powder addition, with a display of the total in kg added in the last 12 cycles.
So I would need to use the amount added during one cycle of the machine and have it displayed on my hmi in the last 12 cycles.
The program goes through a step sequence so when it finishes the dry powder fill sequence and/or the last sequence of the cycle I can grab the dry powder added that cycle....Im a little lost how to have it move it along the chain of the last 12 cycles...
Can anyone point me in the right direction?