I know this is not a PLC question, but i am used to this site and maybe somebody can answer.
What is the Power/Current recommendation for selecting to use either control of the pumping stations from Motor Control Center or from Local Control panel?
I know that Motor Control Centers usually are designed and tested for several issues such as short circuit, material, etc... and these tests might be overlooked in the local control panel provided by the manufacturer.
Thank you!
charbel