Anyone help me about the wiring.
Can you please see the document provided.
It means load 1 is DC Output with has no backup and Load 2 is for the system who need Backup?
I want my PLC on UPS and it need to be wire both terminal to PLC. I mean load 1 and Load 2 both are connected with PLC?
http://www.grainger.com/ec/pdf/Siemens-6EP1933-2EC41-Manual.pdf
Can you please see the document provided.
It means load 1 is DC Output with has no backup and Load 2 is for the system who need Backup?
I want my PLC on UPS and it need to be wire both terminal to PLC. I mean load 1 and Load 2 both are connected with PLC?
http://www.grainger.com/ec/pdf/Siemens-6EP1933-2EC41-Manual.pdf