Dear,
I am reviewing a control panel serving chlorination system, this control panel contains contactor and breakers feeding motors (booster pumps and sample pumps) in the range of 2 KW.
And also this control panel contains PLC and I/O modules and terminals connected to sensors.
Do you believe that this panel require two sections, one having control devices and corresponding wiring and other section having electrical devices and corresponding wiring.
Is there any standard reference that I can follow to convince the contractor to do this change if it is required?
thank you for any feedback,
Charbel
I am reviewing a control panel serving chlorination system, this control panel contains contactor and breakers feeding motors (booster pumps and sample pumps) in the range of 2 KW.
And also this control panel contains PLC and I/O modules and terminals connected to sensors.
Do you believe that this panel require two sections, one having control devices and corresponding wiring and other section having electrical devices and corresponding wiring.
Is there any standard reference that I can follow to convince the contractor to do this change if it is required?
thank you for any feedback,
Charbel