Dear,

It is required to control / alternate the operation of the duty / standby jockey pumps in a fire pumping station and in case the duty jockey pump fails, the standby pump will take over.

as per NFPA 20 (attached) the jockey pumps are not required to be listed, therefore, the PLC can do this job, please advice if this is allowable and if you have an comment on this.

thank you!

Charbel

NFPA.jpg
 

Similar Topics

can anyone help me understand the basic operation of 2 duty and 2 standby Filter bed operation in STP. There will be 2 duty D1 & D2 and 2 Standby...
Replies
0
Views
1,537
i hav attached the power and control diagram. can you guys please help me out to make a plc program using schneider zeliosoft 2 software. any plc...
Replies
1
Views
2,950
heyy guys. can you guys please help me out. plc programming in schneider plc zelio soft 2. can you guys help me out as soon as possible.??? and...
Replies
5
Views
2,646
Dear Sir, Can anyone give some idea about writing logic for 5 duty 1 standby logic Following Selection /Cyclic Alteration P12345 ( Pump1 Duty...
Replies
2
Views
2,145
<P>can anybody please give me a sample ladder program/idea for 3 pump duty,1 standby operation with minimum number of timers</P>
Replies
4
Views
3,285
Back
Top Bottom