Hi guys
I have a machine that works fine, but today we had an issue where the operator speeds the line up to 20cpm the feeder but didnt adjust the press settings to keep in sequence ? Which stops the line ?
Cut a long story short we have a little window to get the the cycle done on 20 cycle
The cycle is a prover drops the product into a stamper -which per presses the belt moves the product to a press and then presses the product flat for a set time - the press goes up and advances the belt that is a cycle
What I thought would be nice is to see how long that sequence takes from pre press to final discharge? On each cycle, is there any
thing hard about this ? Or is it as simple as per press starts the timer and discharge stops it?
I have a machine that works fine, but today we had an issue where the operator speeds the line up to 20cpm the feeder but didnt adjust the press settings to keep in sequence ? Which stops the line ?
Cut a long story short we have a little window to get the the cycle done on 20 cycle
The cycle is a prover drops the product into a stamper -which per presses the belt moves the product to a press and then presses the product flat for a set time - the press goes up and advances the belt that is a cycle
What I thought would be nice is to see how long that sequence takes from pre press to final discharge? On each cycle, is there any
thing hard about this ? Or is it as simple as per press starts the timer and discharge stops it?