View Single Post
Old October 17th, 2006, 09:11 AM   #3
brucechase
Member
United States

brucechase is offline
 
brucechase's Avatar
 
Join Date: Sep 2004
Location: Augusta GA
Posts: 721
USUALLY, I would say:

R=L1
S=N
U=T1
V=T4
5=5 red
6=8 black

I'm not sure that you have a 6 instead of an 8. In layman terms, R and S or L1 and L2 are the incoming power supply.
U and V or T1 and T4 are the main winding of the motor leads and 5 and 8 are the start windings.


EDIT: I guess I was a little late! I agree, post a link or picture to help us verify what we said. Look at the motor diagram and switch diagram and verify you are switching the start windings.

Last edited by brucechase; October 17th, 2006 at 09:14 AM.
  Reply With Quote