Hi all, I have a question on rslogix5000 code. An edit was made to a rung within a routine, this edit was running on test on and off as we needed it. At some point, someone had finalized the edit. My question is can I look back and find out what date or time the edit was finalized or when the code was last saved. I really wanted to know how long the edit was finalized. Thanks