Pumps Lead/Lag Control

Good deal! Now you have enough information to solve the problem.

There are two basic ways. You could use 2 On-Delay (TON) timers (each set for 5 seconds - this is a more simple method),

or you could use only 1 On-Delay (TON) timer set for 10 seconds. With one timer, you could use comparison instructions to control when each pump started by comparing the timer accumulator (T4:0.ACC) word to "5" then to "10". This would be a more advanced method.

Which do you prefer?
 
The info that has been posted by Lancie1 should set you in the correct direction
Is this for your training
 
Okay, given the beginninging program in Post #14, I think it is correct except for adding the time function to Pumps 2 and 3. So what should be the next step?
 
I know now it is your turn to do some programming.
Start by writing the code for a stop start output then follow Lancie1 and post either a zipped copy of your program or a screen snapshot. We need you to do SOME of the work. This is for you to learn not us to do. Sorry
 
Yes, what Ian said - work on it, review your class assignments and notes, and see if you can figure out how to add the two timers, and the 2 bits on the 2 pump output rungs to delay the start for Pumps 2 and 3.
 
So when I get it I will send another thread.
Please do not start another thread. Simply add a new post onto the end of this thread. It will still be here, probably for the next 20 years, so no need to start another one. That makes it easier for people to follow what you are doing, instead of starting over with all the questions about the situation.
 
I am not certain if ill be here in twenty years that would
Be good but i will be 75:ROFLMAO:
 

Similar Topics

I have two pumps that are on VFD's, supplying water. Each runs with identical speed setpoints up to 50%. Above 50% the lead pump will take on...
Replies
20
Views
6,073
Hello!! I am trying to create a AOI to perform lead lag pumping operations based on run time. I do have 8 pumps out of which 6 are duty and 2...
Replies
6
Views
2,641
Greetings! I am currently working on an intuitive AOI to perform lead lag pumping operations based on run time. The concept is to...
Replies
7
Views
7,001
Hi guys, I'm working on controlling two pumps with a single PID loop. I've been doing searches in the forum and with Google so I have the...
Replies
12
Views
7,073
I need to create a system of 2 alternating pumps in ladder logic. I am using RSLogix 5000 2 pumps controlled in 3 modes (OFF, Manual and Auto)...
Replies
46
Views
26,850
Back
Top Bottom