LS,
Our soft PLC's (from IBH) are set to use 50% of PC time with gaps of 10ms:
L KF +50
L KF +10
B BS 11
Now, I want to measure the PLC cycle time with the following code:
A DB 80
L BS 121
T DW 0
L BS 122
T DW 1
L BS 123
T DW 2
I expected the actual scan time to be a value, which would change around the average scantime. But it stays on 10ms. Is this the real scantime, or am I measuring the gap times?
Thanx!
Greetings,
Bram
Our soft PLC's (from IBH) are set to use 50% of PC time with gaps of 10ms:
L KF +50
L KF +10
B BS 11
Now, I want to measure the PLC cycle time with the following code:
A DB 80
L BS 121
T DW 0
L BS 122
T DW 1
L BS 123
T DW 2
I expected the actual scan time to be a value, which would change around the average scantime. But it stays on 10ms. Is this the real scantime, or am I measuring the gap times?
Thanx!
Greetings,
Bram