Fuji Flex PLC NB0

Larry D.Hays

Member
Join Date
Jul 2003
Location
Dayton Oregon
Posts
2
I am programming a Fuji NB0 PLC and I do not understand how to program a timer so that I may increase the time delay beyond 2.54 sec.

I want to program the following..

T0000 D802E
---X2/No-------------------------------------[TMR 0 254] .

This will only allow 2.54 sec. and I need to use the Pot "0" to Vary between 0-10 sec.

The Flex-PC NBO series User's Manual LEH 941 describes how to place a rotation instruction before the timer, but when I try this it dose not work properly

This is a statement from the manual.

Page A-4 Extension of the timer value can be done by numerical operation
as well as counter operation, for example, by placing the rotation instruction
(which rotates the special register value to the left) at a step before the timer
instruction. A single rotation operation doubles the timer value; Therefor,
the value can be multiplied by up to 128 through execution of the rotation
operation seven times.

2.) Also when I am in edit mode the cut, copy, and paste are gray and not available. How do I use the cut, copy, Paste function?
 

Similar Topics

hi guys, i try to google for this software (Fuji Flex PLC Programmer Software) but the result is zero. If you have this software, could you share...
Replies
8
Views
3,562
Hi, I'm working on a small NB2 FUji PLC. Appreciate if anyone has the programming manual for the Flex PLC? I'm trying to force output the...
Replies
8
Views
10,753
I'm Programming a Fuji NB0 PLC with Fuji Flex PLC Programmer Software. I have built the Ladder Logic and was ready to Simulated, but when I click...
Replies
1
Views
8,257
osama
O
Trying to learn how to program a Fuji Flex PC just wondering if any one has a programing manual? I know they are discontinued but we have 2...
Replies
0
Views
581
Hi Guys, I have a small project to upgrade PLC fuji to others brand. So,I need a software FLEX-PC Programmer to upload existing programming code...
Replies
5
Views
4,933
Back
Top Bottom