Hello,
I am completely new to PLC's (and forums) and have been tasked to repair/upgrade a conveyor system at my college. It currently has an Allen Bradley SLC-150 series B in it and I am looking for a replacement for it as an option to fix the system (current one has a CPU fault and I have not been able to diagnose the issue). I have found some series C PLC's online but I could not find any documentation stating the differences between A/B/C to determine if a series C would be a direct replacement for a B. I was wondering if someone could give me some guidance on if I could use a C instead, where to look for the differences between them, or something else to look into for replacing the current one?
I am completely new to PLC's (and forums) and have been tasked to repair/upgrade a conveyor system at my college. It currently has an Allen Bradley SLC-150 series B in it and I am looking for a replacement for it as an option to fix the system (current one has a CPU fault and I have not been able to diagnose the issue). I have found some series C PLC's online but I could not find any documentation stating the differences between A/B/C to determine if a series C would be a direct replacement for a B. I was wondering if someone could give me some guidance on if I could use a C instead, where to look for the differences between them, or something else to look into for replacing the current one?