steven.bishop
Member
- Join Date
- Nov 2003
- Posts
- 12
Hi, i have just been given my first work based plc project. I have to set up a system that counts pallets entering a heat run on a conveyor line. Each loaded pallet must remain in the heat run for 30min. Once the time is complete then they are allowed to move on to the next process. My problem is that i have limited knowledge of shift registers. Am i looking in the right direction or should i be looking at another way to control the pallets through the heat run?