Old December 6th, 2017, 05:19 PM   #1
Ronnie Sullivan
Member
United Kingdom

Ronnie Sullivan is offline
 
Join Date: May 2010
Location: London
Posts: 389
Is it a world record?

7, 3 phase motors connected consecutively - all wrong direction.

They were wired in plain black wire (to be marked when connected)
And I was doing the panel end and another man doing the motor ends with no belling out.

I call the record at 7
  Reply With Quote
Old December 6th, 2017, 05:33 PM   #2
the_msp
Lifetime Supporting Member
United Kingdom

the_msp is offline
 
the_msp's Avatar
 
Join Date: May 2008
Location: Northern Ireland
Posts: 504
You have a 50% chance of getting it right... and a 90% chance of getting it wrong...
__________________
Regards,

Patrick

https://www.youtube.com/user/MrMatrixEngineering
  Reply With Quote
Old December 6th, 2017, 05:38 PM   #3
AustralIan
Member
United Kingdom

AustralIan is offline
 
Join Date: Jan 2013
Location: UK
Posts: 523
That should happen every 128 times you do that, on average.
  Reply With Quote
Old December 6th, 2017, 05:46 PM   #4
Bering C Sparky
Lifetime Supporting Member
United States

Bering C Sparky is offline
 
Bering C Sparky's Avatar
 
Join Date: Mar 2014
Location: Bering Sea, Alaska
Posts: 1,051
They certainly seem to be backward more than they correct for sure......but 7 in a row....you should buy a lotto ticket, maybe your luck is due for a change about now.

BCS
__________________
Changes in Latitude = Changes in Attitude
*********Florida - Seattle - Alaska****************

"I WANT MY LOGIX BACK"
  Reply With Quote
Old December 6th, 2017, 05:54 PM   #5
Ronnie Sullivan
Member
United Kingdom

Ronnie Sullivan is offline
 
Join Date: May 2010
Location: London
Posts: 389
Someone said the exact same thing (lotto ticket)

I have had theory for years about motor direction.
If it is awkward or tight for room to change the wires, they will be wrong.
In the panel they were in the bottom terminals with about 50mm of room. I had to lay on my side using long nosed pliers to get them in
  Reply With Quote
Old December 6th, 2017, 07:36 PM   #6
jraef
Member
United States

jraef is offline
 
jraef's Avatar
 
Join Date: May 2006
Location: Northern California
Posts: 1,311
Quote:
Originally Posted by Ronnie Sullivan View Post
Someone said the exact same thing (lotto ticket)

I have had theory for years about motor direction.
If it is awkward or tight for room to change the wires, they will be wrong.
In the panel they were in the bottom terminals with about 50mm of room. I had to lay on my side using long nosed pliers to get them in
Also, if there is an entire room full of VIPs watching you hook it up to see the new equipment run, the direction will be wrong and no matter how many times you explain that there is no simple way to tell in advance, you will still be the goat...

7 in a row though... that does beat my record of 5, on a machine that had 5 motors on it.
  Reply With Quote
Old December 6th, 2017, 08:14 PM   #7
Aabeck
Member
United States

Aabeck is offline
 
Aabeck's Avatar
 
Join Date: Feb 2013
Location: Detroit
Posts: 826
When I install a line with many motors not VFD controlled I check the rotations and if the majority need reversed I reverse the incoming feed.

I had one customer that insisted the incoming feed had to be a certain rotation and I had to reverse almost 30 of the 35 motors on the line.
  Reply With Quote
Old December 6th, 2017, 08:20 PM   #8
Dirt
Member
Sweden

Dirt is offline
 
Join Date: Apr 2008
Location: Stockholm
Posts: 117
Well, even if you wire up all motors "correctly" but someone mixes the feeding phases somewhere.. Have had that happened before.
  Reply With Quote
Old December 6th, 2017, 08:56 PM   #9
GaryS
Member
United States

GaryS is offline
 
GaryS's Avatar
 
Join Date: Aug 2003
Location: Lancaster Pa.
Posts: 583
try one of these
http://www.aemc.com/products/html/mi...bname=products

they solve the motor rotation problem
  Reply With Quote
Old December 7th, 2017, 01:58 AM   #10
Dirt
Member
Sweden

Dirt is offline
 
Join Date: Apr 2008
Location: Stockholm
Posts: 117
Sometimes they even get the outgoing lines from a 650MW generator in the wrong order..
Elledning_O1-O2.jpg
  Reply With Quote
Old December 7th, 2017, 03:13 AM   #11
GaryS
Member
United States

GaryS is offline
 
GaryS's Avatar
 
Join Date: Aug 2003
Location: Lancaster Pa.
Posts: 583
That must be from across the pond
Here is in the US large stations are all connected to the grid. There is a predefined sequence to the grid network. We don’t cross the wire over like that we sequencronise the generator to the line so everything always match. They constantly monitor it, if it get out by 1/2 hz they open the switch and isolate the generator otherwise it would take the grid down. Look at the great northeast blackout in mid 80's took a big chunk of the grid out due to 1 generator fault. Left most of the North East in the dark they didn't isolate it soon enough they learned their lesson and isolate them faster now.
  Reply With Quote
Old December 7th, 2017, 03:13 AM   #12
Rob...
Member
United Kingdom

Rob... is offline
 
Join Date: Jul 2016
Location: Manchester
Posts: 35
There's a good proportion of Englands distribution network that is the opposite rotation to the rest of the country.

A **** up that was made around the WW2 era, an now would simply cost to much to correct.
  Reply With Quote
Old December 7th, 2017, 03:34 AM   #13
GaryS
Member
United States

GaryS is offline
 
GaryS's Avatar
 
Join Date: Aug 2003
Location: Lancaster Pa.
Posts: 583
By the way I just had to through this out there
Most of the UK power is generated and disturbed. By PPL UK a homely owned company of PPL Global an US Base company headquartered here in Pennsylvania
That's probably the part that stays working
  Reply With Quote
Old December 7th, 2017, 04:48 AM   #14
Saffa
Member
New Zealand

Saffa is offline
 
Join Date: Feb 2012
Location: Bay of Plenty
Posts: 758
Quote:
Originally Posted by GaryS View Post
By the way I just had to through this out there
Most of the UK power is generated and disturbed. By PPL UK a homely owned company of PPL Global an US Base company headquartered here in Pennsylvania
That's probably the part that stays working
I'm surprised anything works properly in the good ol US of A what with only 110VAC and that crazy imperial system.
  Reply With Quote
Old December 7th, 2017, 06:21 AM   #15
Dirt
Member
Sweden

Dirt is offline
 
Join Date: Apr 2008
Location: Stockholm
Posts: 117
Quote:
Originally Posted by GaryS View Post
That must be from across the pond
Here is in the US large stations are all connected to the grid. There is a predefined sequence to the grid network. We don’t cross the wire over like that we sequencronise the generator to the line so everything always match. They constantly monitor it, if it get out by 1/2 hz they open the switch and isolate the generator otherwise it would take the grid down. Look at the great northeast blackout in mid 80's took a big chunk of the grid out due to 1 generator fault. Left most of the North East in the dark they didn't isolate it soon enough they learned their lesson and isolate them faster now.
Well you can't syncronize two phases swapped? Unless you can turn the rotor current in the opposite direction. I do not know the whole story from back in the day, this happened more than a decade before I was born.

Somewhere around 1/2Hz off will trip on my side of the pond as well. Of course this one is connected to the grid, like a large generator in the US.

This was a design fault made in the early 70s.. The grid is supposed to be one certain way (and is), like on your side of the pond. The problem here was that the designer of generator/breaker didn't take into account that it gets "mirrored" looking from one side compared from the other.

This is a very unique solution here, I haven't seen it anywhere else.

Last edited by Dirt; December 7th, 2017 at 06:47 AM.
  Reply With Quote
Reply
Jump to Live PLC Question and Answer Forum

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Topics
Thread Thread Starter Forum Replies Last Post
Disruption in the Automation World, and a practical PLC Code Generator to get started EdStevens LIVE PLC Questions And Answers 80 March 26th, 2017 08:40 AM
Great in the school world. new to the real world. peelseeds LIVE PLC Questions And Answers 9 March 22nd, 2012 07:31 AM
Plc World ghaffar3 LIVE PLC Questions And Answers 7 November 27th, 2006 10:14 AM
OT...World War 3? or the New World geniusintraining LIVE PLC Questions And Answers 5 July 20th, 2006 08:35 PM
World record Jezz LIVE PLC Questions And Answers 5 February 26th, 2004 01:46 AM


All times are GMT -5. The time now is 05:33 PM.


.