I have been working on more and more systems with E300 electronic overloads as a requirement.
I know ENET technology has come a long way, but as a safety reservation, i have always allowed a Physical PLC Output as an Enabel for each starter.
I was wondering what others take on this is or how have you addressed this. There is system ESTOP obviously, but this is something i have always done.
Would appreciate some feedback.
I know ENET technology has come a long way, but as a safety reservation, i have always allowed a Physical PLC Output as an Enabel for each starter.
I was wondering what others take on this is or how have you addressed this. There is system ESTOP obviously, but this is something i have always done.
Would appreciate some feedback.