You are not registered yet. Please click here to register!


 
 
plc storereviewsdownloads
This board is for PLC Related Q&A ONLY. Please DON'T use it for advertising, etc.
 
Try our online PLC Simulator- FREE.  Click here now to try it.

---------->>>>>Get FREE PLC Programming Tips

New Here? Please read this important info!!!


Go Back   PLCS.net - Interactive Q & A > PLCS.net - Interactive Q & A > LIVE PLC Questions And Answers

PLC training tools sale

Reply
 
Thread Tools Display Modes
Old November 1st, 2004, 08:36 AM   #1
zmanvortex
Member
United States

zmanvortex is offline
 
zmanvortex's Avatar
 
Join Date: Apr 2002
Location: Nebraska
Posts: 216
PLC Program Management

Hi all. We are an OEM manufacturer and I do most of the plc programming for our machines. When I write a program on my desktop I save it to our engineering departments server, then when I need to load it into a machine I load a copy of it on my laptop and download it. Lately it has been so busy that this program management thing is getting away from me. I will make a debug adjustment with the laptop and then get pulled of to something else. I cannot remember if I placed the modified program back on the server or not.

I would really love to have some sort of a check in and check out system, but when I go on a service call, my peers may need to load a program for the same machine back at the plant.

I simply don't have time to compare the modification date properties of the files. I was wondering if any of you guys have the same problem, and if you use program management software.

I know that if I just took the time to store the programs right away I would not have this problem, but time is against me lately. Any help would be appreciated. Thanks.
  Reply With Quote
Old November 1st, 2004, 09:01 AM   #2
LJBMatt
Member
United States

LJBMatt is offline
 
Join Date: Apr 2004
Location: Dayton, OH
Posts: 430
There is a PLC software management system called MASS autosave from MDT software. It's a fairly robust system, but is on the expensive side especially if you have a smaller operation. MASS forces users to log into a server to "check out" a PLC program and prevent multiple copies from floating around. When the program is closed it saves the software back up to the server. It can also do revision storage and automatic backup of software. It will also log who last edited the software and who created different revisions of the software. It's a great tool for a medium to large operation, but is expensive and you will need to have a system network (Ethernet, DH+, etc.) setup on the floor for it to be feasible.
  Reply With Quote
Old November 1st, 2004, 09:01 AM   #3
Pierre
Lifetime Supporting Member
Vatican City State

Pierre is offline
 
Pierre's Avatar
 
Join Date: Apr 2002
Location: Montreal
Posts: 1,663
Well, join the Club!

I have seen companie which uses Version control program but they where not OEM.

Since I am one and most my clients are also, Its a catch 22 situation.

What I do is that I have a "General" version that fits to most there equipments versions.

Thats what I and them load into there newer systems in the shop. Once it get to the End-user it gets modified and chages number.

For instance anything, wether its drawings or program, that is done in the shop has version numbers under Zero ... like V0.1

Anything outside (at the clients place) get numbered above zero... like V1.0

My interventions are what sets the version numbers. If its my fourth visit to the plant the drawings AND software version shift to V4.nn

This way I know what was done and when.

ALL system have there own software versions. Some are identical but they all have seperate folders on my backup disk and HD.

I also use a RAM disk (512MB) which is used before I shutdown my laptop. I am very discipline in this mather.

Its very easy to find the last version because it has the highest V number.

I sometimes get asked why I write "programming" in my commisionning reports. "Ain'T this machine the same has the last one" They ask. I usually endup telling them that the last system had 22 photoeyes and this one has 54. They say things like "Does it make a difference, it the same machine" And that is when I start to speak french to them bonkhead
__________________
If it looks like a Cat...
  Reply With Quote
Old November 1st, 2004, 09:05 AM   #4
Ken Moore
Member
United States

Ken Moore is offline
 
Ken Moore's Avatar
 
Join Date: May 2004
Location: Upstate South Carolina
Posts: 2,325
Don't have any kind of management software, but what I do is this:

I always use the date as part of the file name.
That way I know right off the bat, which file is newer.


2003_8_15_machine1
2004_10_28_machine1
2004_11_01_machine1

By putting the year first, they automatically sort in the correct order whenever I open up explorer.

I use the same format for everything, SCADA, PLC, pc backups etc...

Ken
__________________
"To give real service you must add something that cannot be bought or measured with money; and that is sincerity and integrity."
- Donald A. Adams

  Reply With Quote
Old November 1st, 2004, 09:28 AM   #5
RMA
Member
Scotland

RMA is offline
 
RMA's Avatar
 
Join Date: Sep 2004
Location: North of Hamburg, Germany
Posts: 2,039
I use Ken's system too for my archives, although for the current version I use a shorter name because the Siemens S/W basically wants a maximum of 8 characters (presumably DOS making itself felt somehwere along the line).

As he says, by using the Year-Month-Date format, you get your files automatically sorted by date in the Windows Explorer. This makes it very easy to recover a particular previous version of the program.

I also use it for everything now, but I stole the idea from my Bookkeeping software!
  Reply With Quote
Old November 1st, 2004, 10:03 AM   #6
GregPLC
Member
United States

GregPLC is offline
 
GregPLC's Avatar
 
Join Date: Oct 2002
Location: Milwaukee, WI
Posts: 342
Check out a program called QVCS. It's an inexpensive solution for a relatively simple problem.

Greg
__________________
  Reply With Quote
Reply
Jump to Live PLC Question and Answer Forum

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Topics
Thread Thread Starter Forum Replies Last Post
Subroutine philosophy Doug-P LIVE PLC Questions And Answers 31 February 11th, 2013 07:40 AM
tp program the gsm modem which is connected to PLC using ladder programming..help plz Theroyalrattlesnake LIVE PLC Questions And Answers 5 February 24th, 2005 08:37 AM
Could you help me? Convert STL to Ladder Program with Omron PLC vnn LIVE PLC Questions And Answers 14 January 23rd, 2005 10:06 AM
Logo Plc - Time To Hold The Program After Power Fail sanjay_snj LIVE PLC Questions And Answers 2 November 21st, 2004 09:00 PM
PLC Program blueiis_steve_91 LIVE PLC Questions And Answers 13 February 16th, 2003 11:08 AM


All times are GMT -5. The time now is 02:56 AM.


.