Old April 13th, 2011, 05:16 PM   #1
kirki
Member
United States

kirki is offline
 
Join Date: Jul 2010
Location: TX
Posts: 9
Drill time

Guys I know this is a PLC website and iam asking general questions.. Please excuse me. I am trying to figure out the drill time required on a plate which has multiple rows of holes to drill and tap.

1.Drill(ft)=No Of Holes*(Thickness Of Sheet))/12
2.Drill(ft/min)=Spindle r.p.m (rev/min)*Feed(inches/rev))/12
3.Drill Time(hrs)=((Drill Ft / Drill Ft/min)/60)


Is this right? if not how and if it requires tapping then same formula should apply correct? Your advise will be appreciated.
  Reply With Quote
Old April 13th, 2011, 05:35 PM   #2
bernie_carlton
Lifetime Supporting Member + Moderator
United States

bernie_carlton is offline
 
bernie_carlton's Avatar
 
Join Date: Apr 2002
Location: Yakima, Washington
Posts: 4,599
Do you have an allowance for move time between holes or is this purely the actual drilling/tapping time?
__________________
Controlling outputs is the PLC's way of getting its inputs to change.

www.thePLCguy.com
  Reply With Quote
Old April 13th, 2011, 05:43 PM   #3
kirki
Member
United States

kirki is offline
 
Join Date: Jul 2010
Location: TX
Posts: 9
Yes Bernie I will have time for indexing between holes . I will add up that later.
  Reply With Quote
Old April 13th, 2011, 06:01 PM   #4
Steve Bailey
Lifetime Supporting Member + Moderator
United States

Steve Bailey is offline
 
Steve Bailey's Avatar
 
Join Date: Apr 2002
Location: The boondocks of Western Massachusetts USA
Posts: 4,664
In your calculation for Drill(ft) you only calculated the distance the drill travels once its full diameter is drilling. It must also move the distance from where the point of the drill first contacts the sheet until the full diameter is involved.
  Reply With Quote
Old April 13th, 2011, 07:12 PM   #5
kirki
Member
United States

kirki is offline
 
Join Date: Jul 2010
Location: TX
Posts: 9
Quote:
Originally Posted by Steve Bailey View Post
In your calculation for Drill(ft) you only calculated the distance the drill travels once its full diameter is drilling. It must also move the distance from where the point of the drill first contacts the sheet until the full diameter is involved.

For example 1" plate has 120 holes. The Total drill depth is 120" = 120/12 = 10 feet of drilling reqd..
Spindle r.p.m is 1000 and feed is 0.003 inches/ rev
1000 rev/min* 0.003 inches/rev = 3 inches/min (ie. 3 holes) = 0.25 feet/min

So now 10ft / 0.25 ft/min = 40 min..

  Reply With Quote
Old April 13th, 2011, 07:55 PM   #6
James Mcquade
Member
United States

James Mcquade is offline
 
Join Date: Oct 2007
Location: TENNESSEE
Posts: 622
Don't forget that every linear foot of metal is different.
There will be hard spots in the metal at times.
You also need to consider the fact that drill bits get dull.

Are you using guided drill bits for your operation? Drill bits
will walk as they start to drill into metal.

In regards to tapping, you will not be able to tap at 1000 rpm. taps require much slower speeds (less than 100 rpm).
Are you going to use an automatic tap reversing head or stop the tap and then reverse to back the tap out?
you must also consider taps get dull quicker than drill bits.
what is your drill / tap fluid system?

regards,
james
  Reply With Quote
Old April 13th, 2011, 07:58 PM   #7
Steve Bailey
Lifetime Supporting Member + Moderator
United States

Steve Bailey is offline
 
Steve Bailey's Avatar
 
Join Date: Apr 2002
Location: The boondocks of Western Massachusetts USA
Posts: 4,664
A drill bit drilling through a plate looks like this:

__ ______________++
| |
| | P Plate
| |__ ______________
\ /
\ / x
\/ ____



Your calculation only takes into account the "P" distance. You neglected the additional "x" distance that the drill has to travel.
  Reply With Quote
Old April 14th, 2011, 11:12 AM   #8
kirki
Member
United States

kirki is offline
 
Join Date: Jul 2010
Location: TX
Posts: 9
Steve - you are right I'am going to take that distance into account.

But another question in my mind is why should i be even worry about the spindle r.p.m

The Drill Time(hrs)=((drill (Ft) / Drill Ft/min)/60)
  • Isn't this enough to calculate time
  • (OR) i have to do this
Drill(ft/min)=Spindle r.p.m (rev/min)*Feed(inches/rev))/12
Drill Time(hrs)=((Drill Ft / Drill Ft/min)/60)

I'am confused now

Last edited by kirki; April 14th, 2011 at 11:15 AM.
  Reply With Quote
Old April 14th, 2011, 11:27 AM   #9
leitmotif
Member
United States

leitmotif is offline
 
Join Date: Nov 2004
Location: Seattle Wa. USA
Posts: 3,596
Quote:
Originally Posted by kirki View Post
Steve - you are right I'am going to take that distance into account.

But another question in my mind is why should i be even worry about the spindle r.p.m

The Drill Time(hrs)=((drill (Ft) / Drill Ft/min)/60)
  • Isn't this enough to calculate time
  • (OR) i have to do this
Drill(ft/min)=Spindle r.p.m (rev/min)*Feed(inches/rev))/12
Drill Time(hrs)=((Drill Ft / Drill Ft/min)/60)

I'am confused now
Speed is basically RPM
Feed is advance (or depth of cut) per Revolution.
All cutting tools have a certain speed and feed. Going outside of the "boundary" results in rapid wear or breakage.

You can do all the math you want and all the programming you want
BUT if you do not understand what the cutter operating performance is all is for naught.

From sounds of it you need to
1. Purchase a copy of Machinery Handbook
2. Consult with a machine tool distributor for proper setup of this process.

Dan Bentler
  Reply With Quote
Old April 14th, 2011, 11:31 AM   #10
Steve Bailey
Lifetime Supporting Member + Moderator
United States

Steve Bailey is offline
 
Steve Bailey's Avatar
 
Join Date: Apr 2002
Location: The boondocks of Western Massachusetts USA
Posts: 4,664
When tapping you must specify feed per rotation of the spindle. Otherwise, you get a poor quality thread and possibly a broken tap. When you use the same spec for drilling you get a consistent amount of metal removal over the full range of spindle speeds.
  Reply With Quote
Reply
Jump to Live PLC Question and Answer Forum

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Topics
Thread Thread Starter Forum Replies Last Post
WinCC 7.0 PLC Time Sync erdemsvri LIVE PLC Questions And Answers 0 February 22nd, 2011 07:00 AM
Very basic ladder logic question imkzru LIVE PLC Questions And Answers 19 July 29th, 2008 03:49 PM
Pvp 600 Alarm Time Stamp 69FIREBIRD LIVE PLC Questions And Answers 2 October 9th, 2006 10:28 PM
Electronics Questions peavey_wolfgang_2000 LIVE PLC Questions And Answers 4 May 23rd, 2005 08:05 PM
automatic drill machine, need advice snaggletto LIVE PLC Questions And Answers 26 February 22nd, 2005 09:16 PM


All times are GMT -5. The time now is 03:30 PM.


.