RS View 32 Data logging

Join Date
Apr 2014
Location
Vadodara
Posts
49
Hello All,

We have a RS View 32 SCADA system running.. In that I had created a data log mode/file for recording certain number of Boolean tags.
The method I had used is to log the tag when change occurs..
What I am getting is the date and time when the tag value becomes one..
But my requirement is to record the time duration for which the tag value remains 1..
What necessary change I have to made in my current data model..
 
I am not aware if you can accomplish this just using data log.

Data logging is just for data logging . :)

However you have several ways to achieve what you need.

If you use CompactLogix or ControlLogix you can use GSV to get system time and do time calculations as you wish, after that log the result together with your boolean value.

Other thing you can do is use derived tags and/or vba to get system time from PC, use expression to calculate your interval, store into a memory tag and after that log.
 

Similar Topics

Hi, I have to create a log file in Ftview SE when a setpoint is changed on a tag and conirmed with the enter key. Can anybody help please?:lolis:
Replies
4
Views
1,105
Hi, I have to create a log file in Ftview SE when a setpoint is changed on a tag and conirmed with the enter key. Can anybody help please?
Replies
0
Views
628
I'm trying to setup a trend to save data for two sources (both in a compactlogix) so that tends can be viewed over the past few months. I can...
Replies
1
Views
1,275
Hi, Is there a way to do data logging to an Access database on a PLC tag turning from 0 to 1? I know how to do data logging using FT view but...
Replies
1
Views
942
My plc is thr 5069- L306ER and my HMi is the Panelview plus 7. My customer wants me to log on the SD card the values of 8 tags of 2000 arrays. On...
Replies
2
Views
1,410
Back
Top Bottom