Hi all,
We have two Production Lines one controlled with a PLC 3 and the other with a PLC 5 AB. When starting up the second line,(two main compressors powered by 6000 volts with 2600KW and 2350 KW respectively) the first line shuts down with a PLC general fault. Take into account that this does not always happen, and that we can operate for months without problems. any sugestions ?? We are investigating our earthing.. (mixed power and instruments earths).
Any Ideas out there ??
We have two Production Lines one controlled with a PLC 3 and the other with a PLC 5 AB. When starting up the second line,(two main compressors powered by 6000 volts with 2600KW and 2350 KW respectively) the first line shuts down with a PLC general fault. Take into account that this does not always happen, and that we can operate for months without problems. any sugestions ?? We are investigating our earthing.. (mixed power and instruments earths).
Any Ideas out there ??
Last edited: