russrmartin
Member
Hey guys, I have a PV+700 connected dH+ to a PLC5. This is also connected to our company network via ethernet. I have been requested to track machine runtime and # of cycles and have this broken down into 1 hour segments. I did this with a couple of counters in the PLC which is reset at the top of every hour. The data is then moved into two registers where a PV tag is assigned to them. My thinking was that we could poll the PV+ and time stamp the data once an hour and store it to a database. Done this way, all the actual computations and counting would be done in the PLC. This is my preference, but I have an engineer who wants to do all this in the PV+. I have never done this, and I am not even sure how or if I can write a VB script in RSView studio to do this, and what is the general consensus on where these calculations are done most of the time? Any input is appreciated.
Russ
Russ