Bioteknician Mike
Member
Basic question here from a newby. We have an SLC 5 series PLC which was connected to an old PC running NT and Paragon OIT software. The engineering dept. switched out the PC and installed XP and Wonderware. They are claiming that no changes to the "control program" (obtuse for ladder logic). Aren't there some changes needed to the logic in order to interface with the new PC and Wonderware? Thanks for your help!