Hi,

I've been reading about Task and programatically checking for overlaps in one of the Rockwell RSLogix manuals. This looks like a very useful feature but is it possible to check for Overlaps in the I/O Update Task ?

The manuals refer to the I/O Update as a task of priority level 6 which does not appear in the task list. Even though it does not appear can we access the Status information.

Or is this information available through the controller fault bits.

Regards
Fin
 

Similar Topics

Can anyone explain to me why Rockwell thinks a Continuous task is better than a Periodic task? That is what it defaults to. It may cause your...
Replies
10
Views
2,905
I have a PH meter that I am trying to bring its data into 1756-L81. I have downloaded the Rockwell MODBUS AOI kit, but I am not sure if I need to...
Replies
5
Views
160
Hi all. Customer wants analog faceplates really bad, even if we explained that it doesn't make much sense in his process. What he wants to see...
Replies
5
Views
127
Hello, recently I saw a graphic from any Rockwell App, I cant identify which one is. Attached a SS. Its used to see dashboard from datapoints and...
Replies
2
Views
127
I'm working with a project that contains some routines in ST but mostly in ladder. Am I correct in assuming this 'rung': DB1001DO._01AV55_OPEN :=...
Replies
4
Views
114