Where I work we have a AB PLC 5/40 controlling a process that has an PLC 5 connected on Channel 1B and a Dataliner Display on Channel 1A. The PLC 5 on Channel 1B is no longer used and the Dataliner Display is no longer used. Would it be a problem to unplug both from the PLC 5/40 Processor so these devices can be removed at the remote location? The following is how the PLC5/40 is set up:
PLC5/40 Enhanced Platform
Channel Configuration
Channel 1A I/O Channel Mode * Data Highway Plus
Channel 1B I/O Channel Mode * I/O Scanner
PLC5/40 Enhanced Platform
Channel Configuration
Channel 1A I/O Channel Mode * Data Highway Plus
Channel 1B I/O Channel Mode * I/O Scanner