Eric Nelson
Lifetime Supporting Member + Moderator
In RSLogix 5000, when you insert a new rung, it places the new rung AFTER the current rung. I find this annoying since every other PLC software package I use puts the new rung BEFORE the current rung. If you toggle from APPend to INSert (Ctrl-I), it works properly, but then when you insert a new instruction on a rung, it gets placed BEFORE the current instruction...
I realize that "append" means "put after", but why did A-B decide to follow the rules this time? Is there some trick to make BOTH to work the 'normal' way (like RSLogix 500 does)???
-Eric
I realize that "append" means "put after", but why did A-B decide to follow the rules this time? Is there some trick to make BOTH to work the 'normal' way (like RSLogix 500 does)???
-Eric