Has anyone out there run into problems upgrading a FactoryTalk View SE 5.0 application to FT View SE 5.1?

We performed just such an upgrade on a distributed application and now find that after booting the clients, some process (created by Rockwell) is hanging and causing a 2.5 to 3 minute delay before any applications will run.

This problem only occurs after a reboot of the client p.c.. Once the p.c. has been up and operating for awhile, everything functions normally.

If anyone has any further information on this anomally, it would be greatly appreciated.
 

Similar Topics

We have boiler control system runs on A-B PLC. The interface is A-B Panel View Plus 7, mounted on the local control panel very near the boiler...
Replies
2
Views
38
Can I connect two A-B Panel View 7 to a A-B PLC. Same graphics etc. One on the local control panel and the other Panel View 7 in a remote control...
Replies
2
Views
38
I've adjusted the IP of the Panelview Plus as well as the DNS servers; the screen does not show up in the search when I go to the transfer utility...
Replies
3
Views
101
Hello, I am fairly experienced programming and modifying existing FTView ME programs. I have also used FTView SE to make modifications to a...
Replies
5
Views
130
Replaced overlay and glass in HMI but now I can not calibrate the touch screen any suggestions.
Replies
1
Views
82
Back
Top Bottom