Hello, I'm struggling to understand the principal of the project structures.
Higher-level function and mounting location.
Take for example a boat.
The main engine has the main controll cabinet in the machine room, but it also has a controll cabinet on the bridge.
Various pumps is powered from the main switch board in the engine room but can be started from the bridge aswell as in the engine room.
How would one set up the project for this?
Higher-level function and mounting location.
Take for example a boat.
The main engine has the main controll cabinet in the machine room, but it also has a controll cabinet on the bridge.
Various pumps is powered from the main switch board in the engine room but can be started from the bridge aswell as in the engine room.
How would one set up the project for this?