grnick50
Lifetime Supporting Member
Hello all,
My clients asked me to pass hmi Powermeter information from our substation monitoring system to his ERP system.
Our equipment is S7-1500, S7-1200, WinCC prof V12 and Simatic Softnet OPC.
The ERP works with mySQL database.
The minimum acceptable from the ERP integrator is a csv dump every minute with the powermeter values.
However I was thinking it there is a way to connect the Softnet OPC server to the ERP's mySQL database.
Has anyone done this before? Do you know any literature sources that I could look at?
Regards
My clients asked me to pass hmi Powermeter information from our substation monitoring system to his ERP system.
Our equipment is S7-1500, S7-1200, WinCC prof V12 and Simatic Softnet OPC.
The ERP works with mySQL database.
The minimum acceptable from the ERP integrator is a csv dump every minute with the powermeter values.
However I was thinking it there is a way to connect the Softnet OPC server to the ERP's mySQL database.
Has anyone done this before? Do you know any literature sources that I could look at?
Regards