The current setup is a
ab 5/05 plc
2 8 inch cmore touchscreen(1 on each end of line) -ethernet protocol
1 6 inch cmore touchscreen -ethernet
1 existing visual basic program -ethernet protocol
I am having issues with ethernet port not updating the cmore touschscreens.
The channel 1 status is showing me
single 80
mulitple 56
deferred transmissions 128
total 9
incoming 9
outcoming 0
max connection allowed 0
Is there any manuals that explain how to change any of the above settings
thanks
ab 5/05 plc
2 8 inch cmore touchscreen(1 on each end of line) -ethernet protocol
1 6 inch cmore touchscreen -ethernet
1 existing visual basic program -ethernet protocol
I am having issues with ethernet port not updating the cmore touschscreens.
The channel 1 status is showing me
single 80
mulitple 56
deferred transmissions 128
total 9
incoming 9
outcoming 0
max connection allowed 0
Is there any manuals that explain how to change any of the above settings
thanks