GheorghiuCatalin
Member
I want to record into a PLC 500 production downtime with posibility to know from what time(HH:mm) and how(min) knowing that production needs to run 24/7. All this downtime needs to be stored into PLC and need to be reported at 12 hours shift(8:00 to 20:00) or (20:00 to 08:00).
Can anybody give me a sugestion how to do it?
Can anybody give me a sugestion how to do it?