keshik
Lifetime Supporting Member
This is a little off the PLC topic but hopefully within the wheelhouse of people here!
We have a client who has asked if on a future project they can use a wire brush cable entry system (into our control panels) instead of Roxtec or conduit. This will be for panels that are located inside a shipping container (not outside). There is a divider wall in the container that separates a process room from the electrical/control room. Currently individual cables leave the top of our enclosure through Roxtec and then enter the process room through additional Roxtec.
Their goal is to decrease the amount of time it takes to wire the panel at the skid builder.
Does anyone have ideas for ways that we can simplify (make faster/cheaper) this installation? Potential other ideas include remote I/O in the process room or more junction boxes in the process room with larger multi-conductor cables between the j-boxes and our control panels.
We have a client who has asked if on a future project they can use a wire brush cable entry system (into our control panels) instead of Roxtec or conduit. This will be for panels that are located inside a shipping container (not outside). There is a divider wall in the container that separates a process room from the electrical/control room. Currently individual cables leave the top of our enclosure through Roxtec and then enter the process room through additional Roxtec.
Their goal is to decrease the amount of time it takes to wire the panel at the skid builder.
Does anyone have ideas for ways that we can simplify (make faster/cheaper) this installation? Potential other ideas include remote I/O in the process room or more junction boxes in the process room with larger multi-conductor cables between the j-boxes and our control panels.